Please complete this form to be added to our approved contractor list
Please read the terms below, then sign and date to continue.
In consideration of the Agent introducing work to the Contractor, the Contractor will provide priority service to the landlords of the Agent, completing quality work at competitive prices.
It is acknowledged that the Agent is only the agent for the landlord of the property. Different properties will have different landlords and the actual landlord will be identified on each works order. The Agent will only ask the Contractor to complete works for which they have the agency authority to enquire. If works are priced such that they exceed the agency authority, then the Agent will normally have to seek specific permission from the landlord to proceed.
In accepting requests to provide quotations and to carry out any jobs on any properties the Contractor accepts that they will, unless there is specific agreement to the contrary, be working for the landlord, even if instructed by the landlord’s agent.
The Contractor undertakes to attend the property within the agreed timescale and complete the works/quotations instructed subject to what has been requested, materials needed and ability to gain access if the property is occupied, as soon as is practicable.
The Contractor will take full responsibility for all keys, security fobs or other devices supplied to them by M A S O N S and will pay the full costs of replacement or changing any locks, security codes or other access devices at the Property as M A S O N S deems appropriate if any keys, fobs etc. are lost, misplaced or not returned to M A S O N S or the landlord. The Contractor further agrees not to leave keys or any other entry device or written instructions unattended.
The Contractor shall only carry out the works that are stated on the works order sheet. Any additional quotes, works or variations (“extras”) shall be reported to the Agent and a separate instruction may then be issued. Under no circumstances must instructions be taken from the property occupiers.
The Contractor agrees not to discuss any matters relating to M A S O N S with any competitors; disclose any written or spoken material relating to any works to be carried out at any properties for M A S O N S or their landlords; nor give any information relating to the addresses of, or landlords of any properties to any third party including any competitors.
The Contractor can only use personal data for the purpose for which it is provided and should refer to the Data Processing Agreement to understand the GDPR responsibilities of both parties.
By accepting any requests for works or quotations the Contractor takes full responsibility for conducting their own risk assessment for the professional undertaking of any instructed work issued by the Agent, whose suggestion of the works required should not in any way be taken as a method statement or confirmation that the site or works to remedy any defects in the property or works required to remedy them are safe to be carried out. A copy of such risk assessment should be readily available for inspection by the Agent, statutory authorities or others with a legitimate interest, upon request. It is the responsibility of the Contractor to notify the Agent if the work requested is outside their skills, qualifications or ability. The appointed Contractor shall be responsible for ensuring any sub-contractors are appropriately qualified, skilled, insured and managed. Anything the Contractor takes on in this agreement should be included in any sub-contracting agreement.
For the works instructed, the Contractor shall provide all the materials, plant and labour necessary to execute the works and protect the property and contents providing dust sheets, boarding, plastic sheets etc as appropriate. The Contractor also undertakes to guard against injury to persons or animals providing notices, cones etc as required.
On completion of the works all excess materials, debris and plant shall be removed from site and the property left clean and tidy.
The Contractor agrees that they will ensure all staff and sub-contractors are dressed appropriately for a professional in that trade and they remain polite and considerate to those in the property and locality at all times.
All works shall be undertaken in a professional manner and at all times must satisfy all national and local rules, laws and legislation including the positioning of any skips, scaffolding or other equipment.
M A S O N S has the right after consultation with the Contractor to request the removal from or involvement with, any works or services, any person employed or engaged (where permitted) by the Contractor where their performance or conduct has been unsatisfactory or subject to a complaint from the occupant or the landlord or any employee of M A S O N S.
The Contractor must at all times observe all Health & Safety legislation and standards including but not limited to the Health & Safety at Work Act, Working at Height Regulations, Control of Asbestos at Work Regulations, COSHH Regulations, British Standards and HSE guidance as relevant and applicable.
All necessary safe working platforms shall be provided by the Contractor.
The Contractor shall fully indemnify the Landlord and Agent and shall at all times maintain a minimum £2 million Public Liability Insurance.
All invoices must be accompanied by the completed Works Order and any test/completion certificates as appropriate. Where not already provided, a full description of the fault found, the cause and liability must be included together with a list of all materials, plant and labour utilised.
Any gas related works have to be completed by, and signed off by, a competent and qualified Gas Safe Registered engineer.
Any electrical related works have to be completed by a competent and qualified electrical engineer, who is registered to a nationally recognised electrical certification scheme. Electrical works falling under Part P of Building Regulations must either be signed off by Building Control or a Part P qualified electrician.
Payment will only be made on receipt of the invoice and works order form showing the works duly completed. Payments will be made as soon as funds are received from the rent which can range from 2 – 4 weeks and in some cases, slightly longer such as 4 – 8 weeks. If the works are larger than the value of the net rent for a month or the property is unoccupied (therefore no rent is being received) the Agent will have either arranged to be put in funds or will forward the invoice to the Landlord for them to pay directly.
Invoices MUST be addressed to the Landlord but sent to the address on the Works Order. Invoices must be received by the Agent within 5 days of completion of the works. The Agent will try and arrange payment of invoices received after this time but as the management may have been terminated, cannot be sure of being able to.
All works orders issued by the Agent to the Contractor will be on these standard terms and conditions unless otherwise specifically agreed in writing.
01462 557 477 · hello@masons-property.com · www.masons-property.com